OUR BRAND
NETWORK

Recognized with the Award of Merit at the 2019 EIMA Hero Awards, presented by EIFS Industry Members Association (EIMA). Mary Our Queen Catholic Church is an expansive and impressive testament to the marriage of old and new.

Originally the parish hoped to bring St. Gerard Church, which closed its doors in 2008 in Buffalo, Ne​w York to Peachtree Corners, Georgia — stone by stone. However, it became clear moving the church would be too costly. The parish determined the next best option would be to bring inspiration and artifacts from St. Gerard to Mary Our Queen Church.

​St. Gerard Church was modeled after the Papal Basilica St. Paul Outside the Walls in Rome. As it was important to the parish to create an elegant look and feel, reminiscent of St. Gerard, EIFS became the ideal choice, specifically Finestone’s Pebbletex CI-DCA system with Limestone Finish. The high-performance system features continuous insulation and continuous air and water resistive barrier, while the finish is highly durable and weather-resistant, helping the church achieve the desired exterior aesthetic as well as reduced energy and maintenance costs.

Contact Us

Request for Product Certification Letter​

Name*
Information Request (Mark all that apply)*
Specification To Be Met*
Phone*
Email*
Sales Representative*

Product Information


Product Name(s)*
Product Size(s)*

Product Information


Project Location*
Name of Project*
Bid Date*

Architect Information


Firm
Address
Phone
Email

General Contractor Information


Company Name
Address
Phone
Email

Masonry Contractor Information


Company Name
Address
Phone
Email

Notes


Add Additional Notes Here

Match Existing Building

Name*
I am a ...
Other
Phone*
Email*
Project Location*
Name of Project*
Bid Date*